One oceanographic mooring was deployed 15NM NNE of Ustica Island, in the framework of the VECTOR project, at the border of the Tyrrhenian Central Deep. After preparation on board of the mooring lines and equipment (current meters, sediment traps, CTD), ship was put halfway the mooring length (aproximately 3200 m) ENE of the planned position and the weight was released accordingly upon latest wind and waves condition. Table 4 and Fig.5 report and show the position of the mooring, while Fig. shows its design.
figure
figure