Next: CTD TO SIS ASVP
Up: APPENDIX
Previous: APPENDIX
Contents
DIARY OF OPERATIONS
- 2009-07-10 Departure from Bologna
- 2009-07-11 Arrival in Messina, mobilization
- 2009-07-12 Departure from Messina 07:30. Transit to calabrian coast for multibeam calibration. Final multibeam calibration Ciro' Marina.
- 2009-07-13 Disembark Konsberg technitian Crotone, depart for Montenegro. In the afternoon test of multibeam (CTD04) and magnetometer on a wreck SE Otranto, 90 m depth. In the evening sailing to Montenegro, 20 NM S of territorial waters.
- 2009-07-14 06:45 CTD05, first line multibeam. Test magnetometer. 11:00 problems Multibeam, sailing to Zelenika. Practice, embark Dr. Bulatovic, sail for work outside Kotor Bay
- 2009-07-15 Box-corer bioherms off Kotor Bay,
- 2009-07-16 Work in Kotor Bay
- 2009-07-17 Work in Risan and Tivat Bay
- 2009-07-18 08:00 docked in Zelenika, disembark Dr. D'Oriano, finish work in Kotor Bay,
- 2009-07-19 Work in Herzeg-Novj and Risan Bay (BC,Coring)
- 2009-07-20 Sampling offshore Kotor, Budva, 18:00 Docked in Zelenika, disembark Dr. Bulatovic, embark Dr. Kljajic.
- 2009-07-21 Work in Bar Region, sampling. Anchor NW breakwater Bar
- 2009-07-22 Work in Bojana region, sampling. Docked Bar 20:00.
- 2009-07-23 Bojana River Mouth, Box-cores, Core, transit to Zelenika. Docked 18:15, disembark Dr. Kljaijc, leave for Italy 20:00
- 2009-07-24 Docked in Monopoli 08:00, de-mob 18:00.
Next: CTD TO SIS ASVP
Up: APPENDIX
Previous: APPENDIX
Contents
2009-09-02